Capability
Fabrics and specifications
Everything that decides whether the kit is any good happens in our unit. We do not sub-contract cutting, printing or stitching, which is why we can answer questions about your order the same day and why we are willing to show you the floor.
Done in-house
- Pattern making
- Cutting
- Dye-sublimation
- Screen print
- Embroidery
- Heat transfer
- Cut & sew
- Flatlock & overlock
- Quality control
- Labelling & packing
| Fabric | Weight | Used for | How it behaves |
|---|---|---|---|
| Micro-polyester interlock | 140–160 GSM | Match jerseys, training tops | Light, dries fast, takes sublimation cleanly |
| Polyester bird-eye mesh | 130–150 GSM | Panels, keeper shirts, bibs | Open weave, moves a lot of air |
| Poly–spandex knit | 190–220 GSM | Base layers, women’s range | Four-way stretch, holds its shape after washing |
| Polyester interlock, heavy | 220–260 GSM | Tracksuits, presentation wear | Smooth face, hangs properly |
| Brushed-back fleece | 280–320 GSM | Hoodies, sweats, winter layers | Warm, soft inside |
| Piqué cotton–poly | 190–210 GSM | Polos, coach and staff wear | Textured face, good for embroidery |
| Woven ripstop shell | 75–110 GSM | Rain jackets, windbreakers | Sheds water, packs down small |
| Smallest order | No fixed minimum. Tell us how many you need — the unit price improves from 50 pieces per design. |
|---|---|
| Sample | 10–14 days from artwork sign-off, couriered to you. Cost credited against the order. |
| Production | 4–6 weeks from sample approval, depending on quantity and decoration. |
| Decoration | Full sublimation, screen print, embroidery, heat transfer, woven and rubber badges. |
| Colour matching | Send a Pantone TCX number if you have one. If not, send a shirt or a daylight photo and we match it on the sample. |
| Private label | Your woven neck label, hang tag, size and care label, printed poly bag. |
| Shipping | FOB Sialkot if you have a forwarder, or door to door — air 5–8 days, sea 25–35 days. |
| Documents | Commercial invoice, packing list, certificate of origin. |
| Payment | Deposit against the proforma invoice, balance before dispatch. Bank transfer or Wise. |
These lead times are for a normal order in a normal month. A big size run, heavy decoration or peak season can move them. Whatever the real dates are, they go on the proforma invoice before you pay anything — we would rather tell you eight weeks and deliver in six than the other way round.
Next step
Not sure which fabric you need?
Tell us the sport, the climate and how hard the kit gets worn. We will recommend the weight and send a swatch with the sample.